
TDLR-licensed balance-of-plant (BOP) electrical, native to ERCOT (Electric Reliability Council of Texas) - collection systems, combiner and inverter wiring, plant SCADA (Supervisory Control and Data Acquisition) and O&M (Operations & Maintenance), with an HV (High Voltage) substation partner under one accountable prime.
TDLR-licensed Electrical Contractor - Master Electrician Colin Miller - West Texas / Permian Basin base (Midland, Odessa) - NASCLA: TX home, NM / OK / CO reciprocal
We list what our crews self-perform today separately from what runs through our HV partner, so the scope split is clear before you award.
Connect directly with our Renewables BOP team. Fast turnaround on bids and prequalification for critical infrastructure. We mobilize from a West Texas and Permian Basin base (Midland and Odessa), with NASCLA reciprocity in New Mexico, Oklahoma and Colorado.
432-653-4742Array-side and AC/DC collection-system wiring, combiner and inverter / PCS terminations and re-terminations, LV power distribution, plant SCADA and DAS integration, inverter commissioning support under OEM / EPC direction, and electrical O&M. Substation and MV interconnection run through our licensed Texas HV substation partner with SATOKIE as prime.
Yes, through a licensed Texas HV substation partner with SATOKIE as the single prime, so there is no seam between the array and the point of interconnection.
A West Texas / Permian home base, statewide across ERCOT, with NASCLA reciprocal activation into NM, OK and CO for multi-state developer portfolios.
Yes. Prequal-ready with a TDLR license, NASCLA reciprocal states, ACORD 25 certificates, and a safety program (OSHA 30, NFPA 70E). Request the prequal package.
Texas leads the US in utility-scale solar and wind build-out and sits on a deep ERCOT interconnection queue. SATOKIE gives developers one accountable prime from the array to the point of interconnection: self-perform BOP electrical and plant SCADA, with substation and MV interconnection through our licensed Texas HV partner.